OMRON pick-and-place Robot Project

The second of my projects at Bobrick Washroom. I fully set-up and prepared the OMRON robot as well as its environment. This project required, robotic motion control, system logic (ACE software), fixture design, and rapid prototyping. I brought the project to life from CAD file to fully functioning robotic system, ready for the next engineer to direct the robot's moves and finalize fixturing.